Urgent engineering and delivery part 4/4

Quality control and shipment

As a part of every single delivery at Tcomp, it first went to our QA department to be inspected, measured acc. To approved technical drawings.

Read more

Urgent engineering and delivery part 3/4

Assembly
After all parts were in house, the assembly started, to join bellows, inner sleeve, flanges and other parts according to the customer’s requirements.

Read more

Urgent engineering and delivery part 2/4

Pre-fab
After all engineering, drawings were sent to our intern pre-fab workshop, with laser cut and new bending machine etc.

Read more

Urgent engineering and delivery part 1/4

CASE: Tcomp is delivering 2 pcs. special design for T/C exhaust for a turbo charger with custom flanges and inner sleeve.

Read more

Rectangular expansion joint

Rectangular Metal expansion joint manufactured on our new Yangli MB 8 – 250 x 3299 CNC press brake.

Read more

Vacuum seminar at CERN

In the start of October Tcomp (Mathias L. Sørensen) had the pleasure of attending a vacuum seminar at CERN through their Big Science membership.

Read more

3 bellows expansion joint

Special 3 bellows expansion joint DN125 for air.

Also available with 2 bellows.

Read more

DN 1800 steel expansion joint

DN 1800 Tcomp steel expansion joint ready to be packed and sent to the end customer.

Read more

Satisfied customer

Another new customer who was very satisfied after their inspection and check at Tcomp.

Read more

Exciting piping project

Tcomp have just completed another exciting piping project with a short delivery time of pipe system to customer within the green transition.
The steel plates were delivered by the customer, and Tcomp has then, in close cooperation with the parent company Tjæreborg Industri,

Read more